Documents and Information for Design Professionals and Contractors
Unless otherwise noted, all forms are compatible with both Adobe Acrobat and Microsoft Word format. If you do not have Adobe Acrobat or Microsoft Word, then visit Adobe and download Acrobat Reader for free.
Note that all links will open in a separate window.
Contracts
CMAR Contract (CMAR Procurement)
DP Contract (CMAR Procurement)
DP Contract (ARQ Procurement)
Job Order Contract (JOC Procurement)
Hard Bid Contract (Design Bid Build Procurement)
Task Order Contract (Projects Under $100,000)
Design–Build Contract (Design–Build Procurement)
CMAR Contract (CMAR Procurement)
DP Contract (CMAR Procurement)
DP Contract (ARQ Procurement)
Job Order Contract (JOC Procurement)
Hard Bid Contract (Design Bid Build Procurement)
Task Order Contract (Projects Under $100,000)
Plan review, permit and inspections
Please consult your Project Manager
Please consult your Project Manager
- Inspection Procedure (coming soon)
- FS #15 Inspection Record
To perform excavation work and request a blue stake, contractors shall refer to the procedures and forms listed below.
Additional information
Guidelines for Construction Procurement
NAU Design Guidelines and Technical Standards
- Complete Design Guidelines and Technical Standards Manual
- Introduction and User Guide
- Design Guidelines
- Division 00 – Procurement and Contracting Requirements
- Division 01 – General Requirements
- Division 02 – Existing Conditions
- Division 03 – Concrete
- Division 04 – Masonry
- Division 05 – Metals
- Division 06 – Wood, Plastics, and Composites
- Division 07 – Thermal and Moisture Protection
- Division 08 – Openings
- Division 09 – Finishes
- Division 10 – Specialties
- Division 11 – Equipment
- Division 12 – Furnishings
- Division 13 – Special Construction
- Division 14 – Conveying Equipment
- Division 21 – Fire Suppression
- Division 22 – Plumbing
- Division 23 – Heating, Ventilation, and Air Conditioning (HVAC)
- Division 25 – Integrated Controls
- Division 26 – Electrical Systems
- Division 27 – Communications
- Division 28 – Electronic Safety and Security
- Division 31 – Earthwork
- Division 32 – Exterior Improvements
- Division 33 – Utilities
- Complete Design Guidelines and Technical Standards Manual
- Introduction and User Guide
- Design Guidelines
- Division 00
- Division 01
- Division 02
- Division 03
- Division 04
- Division 05
- Division 06
- Division 07
- Division 08
- Division 09
- Division 10
- Division 11
- Division 12
- Division 13
- Division 14
- Division 15
- Division 16
- Division 21
- Division 22
- Division 23
- Division 26
- Division 27
- Division 28
- Division 32
- Division 33