Documents and Information for Design Professionals and Contractors
Unless otherwise noted, all forms are compatible with both Adobe Acrobat and Microsoft Word format. If you do not have Adobe Acrobat or Microsoft Word, then visit Adobe and download Acrobat Reader for free.
Note that all links will open in a separate window.
Contracts
Contracts current Accordion Closed
CMAR Contract (CMAR Procurement)
DP Contract (CMAR Procurement)
DP Contract (ARQ Procurement)
Job Order Contract (JOC Procurement)
Hard Bid Contract (Design Bid Build Procurement)
Task Order Contract (Projects Under $100,000)
Design–Build Contract (Design–Build Procurement)
Contracts archive Accordion Closed
CMAR Contract (CMAR Procurement)
DP Contract (CMAR Procurement)
DP Contract (ARQ Procurement)
Job Order Contract (JOC Procurement)
Hard Bid Contract (Design Bid Build Procurement)
Task Order Contract (Projects Under $100,000)
Plan review, permit and inspections
Inspections Accordion Closed
- Inspection Procedure (coming soon)
- FS #15 Inspection Record
Blue Stake Accordion Closed
To perform excavation work and request a blue stake, contractors shall refer to the procedures and forms listed below.
Additional information
Guidelines for Construction Procurement
NAU Technical Standards
Current – Volume FY21 Version 1 – January 8, 2021 Accordion Closed
- Complete Design Guidelines and Technical Standards Manual
- Introduction and User Guide
- Design Guidelines
- Division 0 – Bidding Requirements, Contract Forms and Conditions of Contract
- Division 1 – General Requirements
- Division 2 – Sitework
- Division 3 – Concrete
- Division 4 – Masonry
- Division 5 – Metals
- Division 6 – Woods and Plastics
- Division 7 – Thermal and Moisture Protection
- Division 8 – Doors and Windows
- Division 9 – Finishes
- Division 10 – Specialties
- Division 11 – Equipment
- Division 12 – Furnishings
- Division 13 – Special Construction
- Division 14 – Elevators
- Division 21 – Fire Suppression
- Division 22 – Plumbing
- Division 23 – Heating Ventilating and Air Conditioning
- Division 26 – Electrical Systems
- Division 27 – Communications
- Division 28 – Electrical Safety and Security
- Division 32 – Exterior Improvements
- Division 33 – Utilities
Archive (all tech standards for contracts executed prior to January, 2021) Accordion Closed
- Complete Design Guidelines and Technical Standards Manual
- Introduction and User Guide
- Design Guidelines
- Division 0
- Division 1
- Division 2
- Division 3
- Division 4
- Division 5
- Division 6
- Division 7
- Division 8
- Division 9
- Division 10
- Division 11
- Division 12
- Division 13
- Division 14
- Division 15
- Division 16
- Division 21
- Division 22
- Division 23
- Division 26
- Division 27
- Division 28
- Division 32
- Division 33