Office of Sponsored Projects
Virtual Visit Request info Apply
  • Getting started
    • Who is my OSP contact?
    • Sponsored Project information
  • Funding opportunities
    • Funding Resources
    • Hispanic-Serving Institution grant opportunities
    • Limited Submission opportunities
  • Sponsored Project lifecycle
    • Overview
    • Find funding
    • Proposal development
    • Proposal submission
    • Award setup
    • Project management
    • Project closeout
  • Resources
    • Indirect cost rates (IDC)
    • Frequently requested information
    • Forms, worksheets, & tools
    • Limited Submission process
    • Policies
    • Proposal preparation information
    • Uniform guidance
  • About
    • Mission, values, principles, & goals
    • Team
  • IN
  • Office of Sponsored Projects
  • Prior Approval Cost Items

Cost Items that Require Prior Written Approvals

The cost items in the chart below each require prior written approval in order to be either direct charged to a federally-funded award, or to be committed and used as cost sharing or matching for a federally funded award.
(Note: Prior Approvals are also required for certain actions related to use and disposition of property and for certain programmatic changes. Details are listed in separate sections of this documentation.)

For each of the costs listed in the table below the Office of Sponsored Projects (OSP) will use the following criteria when reviewing and approving such costs:

Budget Details for Direct charges or for Cost Sharing/Matching charges:

Any sponsor-specific rules or instructions for obtaining prior approval during the proposal and formal award process must have been followed. In the absence of such, OSP will look for the following within the approved budget:

  • The item must be clearly identified and labeled, using the federal cost description terminology in the table below (to the extent possible).
  • The same process should be used by any sub-recipients who wish to direct charge or use the costs for cost sharing or matching for their portion of the award.

Re-budgeting procedures:

After an award has been made, if the PI decides that an item requiring prior written approval is needed to carry out the project, a formal request for approval needs to be processed. The request should follow applicable sponsor and institutional procedures for re-budgeting and approval must be received and provided to the Office of Sponsored Projects prior to any such costs being charged to the sponsored award.

Non-federal funds:

Costs listed in the chart below may be directly charged to non-federally funded awards without prior written approval, if needed for the project (it must otherwise meet the applicable criteria of a direct and allowable cost). Exceptions would be for non-federal awards that are used as matching for a federally funded award or where the sponsor imposes restrictions or specifically disallows such costs.

Item (per listing in 2 CFR 200.407) Described in detail in 2 CFR section: Prior approval details/other comments for Federally funded accounts
Unrecovered Indirect Costs – the use of unrecovered indirect costs (including indirect costs on cost sharing or matching direct costs) as Cost Sharing or Matching 200.306 (c)Prior approval of the Federal awarding agency.
Unrecovered indirect cost means the difference between the amount charged to the Federal award and the amount which could have been charged to the Federal award under the non-Federal entity’s approved negotiated indirect cost rate.
Use of Program Income to meet cost sharing or matching requirements of the award 200.307 (e) (3)Prior approval of the Federal awarding agency.
Transfer of funds budgeted for participant support costs to other categories of expense. 200.308 (c) (5)
Federal awarding agency has the option to waive
Prior approval of the Federal awarding agency. Participant support costs are defined in 200.75
Subawards. The subawarding, contracting out or transferring of any of the work of the Federal award that was NOT described and funded in the approved award 200.308 (c ) (6)
Federal awarding agency has the option to waive.
Recipients must request prior approvals from the Federal awarding agency.
Applies to all non-construction awards, but does not apply to the acquisition of supplies, material, equipment or general support services (vendor relationships).
Changes in approved cost-sharing or matching provided by the non-federal entity 200.308 (c) (7)
Federal awarding agency has the option to waive.
Prior approval of the Federal awarding agency.
Applies to all non-construction awards.
Need for additional federal funds to complete the project 200.308 (c) (8) Must be reported and prior approval requested.
Pre Award Costs incurred more than 90 days prior to award 200.308 (d) (1) Expenses more than 90 calendar days prior to the award date require prior approval of the Federal awarding agency.
Also 200.458 for situations where 90 day waiver is not applicable. Prior approval for project costs incurred equal to or less than 90 calendar days prior to award MAY be waived at the Federal agency’s discretion. The waiver is typically applied automatically to awards that support research. If the rare case that such waiver is not applicable, then 200.458 applies and all pre award costs must have prior approval.
Issuance of fixed amount subaward agreements – up to the Simplified Acquisition Threshold (currently $150,000) 200.332Prior written approval from the Federal awarding agency. In addition the sub-awards must also meet the requirements for fixed amount awards in 200.201(b). Implies that sub-awards above the Simplified Acquisition Threshold are NOT allowed to be issued as fixed amount.
Administrative and Clerical Salaries 200.413 (c)(3)Such costs must be explicitly included in the budget or have the prior written approval of the Federal awarding agency. In addition, the costs must be integral to and specifically identifiable with a project. See details regarding KState’s benchmarks for allowability in the section of this manual entitled “Additional Guidance for Specific Costs”.
Faculty salary- excess of proportionate share of pay - any amount that exceeds the proportionate share of the Institutional Base Salary (IBS) for the period during which the faculty member worked on the award. 200.430 (h)(2)Must have prior approval by the Federal awarding agency. IBS is defined as the annual compensation paid for an individual’s appointment, whether that individual’s time is spent on research, instruction, administration, or other activities.
Intra-institutional consulting by faculty where charges for such work represent additional compensation above the Institutional Base Salary (IBS). 200.430 (h) (3)Must be specifically provided for in the Federal award or approved in writing by the Federal awarding agency. The consulting must be “unusual” as defined in the same section and the allowability conditions for Extra Service Pay in 200.430 (h) (4) must be met.
Costs that might otherwise be considered Entertainment Costs that have a programmatic purpose for the specific project at hand.200.438Must be authorized in the approved budget for the Federal award or have written approval of the Federal awarding agency.
Office of Sponsored Projects
Location
Room - 4th floor, Building 20
Science Annex
525 S. Beaver Street
Flagstaff, AZ 86011-4130
Mailing Address
PO Box 4130
Flagstaff, AZ 86011-4130
Contact Form
Email
NAU-OSP@nau.edu
Phone
928-523-4880
Fax
928-523-1075