{"id":43791,"date":"2016-05-11T10:27:49","date_gmt":"2016-05-11T17:27:49","guid":{"rendered":"http:\/\/stage.headlessnauedu-b6hgdzckfdgxgzhe.westus-01.azurewebsites.net\/?p=43791"},"modified":"2016-05-11T13:26:58","modified_gmt":"2016-05-11T20:26:58","slug":"construction-summer","status":"publish","type":"post","link":"https:\/\/in.nau.edu\/news\/construction-summer\/","title":{"rendered":"Construction on Flagstaff campus scheduled for summer"},"content":{"rendered":"<p class=\"p1\"><span class=\"s1\">Construction on Northern Arizona University&#8217;s Flagstaff campus this summer includes improvements to the pedway and road\u00a0repair on San Francisco Street. <\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">Pedway improvements will be made between DuPont Avenue and\u00a0the University Union. The first phase will begin Monday, May 16,<\/span><span class=\"s1\">\u00a0and encompass the area between the north side of the University Union\u00a0and the north side of the Science and Health Building. The second phase of construction from the\u00a0north side of the Science and Health Building\u00a0to DuPont\u00a0Avenue will begin\u00a0Monday, June 6<\/span><span class=\"s1\">. <\/span><span class=\"s1\">Construction is expected to be complete by Friday, Aug. 19.\u00a0<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">Asphalt repair will begin Thursday, May 19, along San Francisco Street between Franklin Avenue and Mountain View Drive. Phase one will begin next week and last up to two weeks, with individuals directing traffic to allow temporary two-way traffic. A full closure of this section of San Francisco Street will begin Wednesday, June 8 and is scheduled\u00a0to reopen Friday, June 10.\u00a0During the temporary closures of the road, detours will be in place from McCreary Drive to the transit spine.\u00a0<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">There also will be some\u00a0minor concrete sidewalk replacements along the east\u00a0side of San Francisco Street near the drop-off loop that will close a small section of sidewalk beginning Thursday, May 19.\u00a0<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">Building managers will receive updates throughout the summer indicating construction closures and impacts across campus. <a href=\"http:\/\/nau.edu\/uploadedFiles\/Administrative\/Finance_and_Administration\/Facility_Services\/Folder_Templates\/Summer%202016%20Construction%20-%20Project%20Information%20-%20040516.pdf\">Click here for a complete list of summer construction projects<\/a>. Detailed maps of <a href=\"http:\/\/nau.edu\/uploadedFiles\/Administrative\/Finance_and_Administration\/Facility_Services\/Folder_Templates\/Summer%202016%20Construction%20-%20Sitework%20Map%20-%20040616.pdf\">sitework<\/a> and <a href=\"http:\/\/nau.edu\/uploadedFiles\/Administrative\/Finance_and_Administration\/Facility_Services\/Folder_Templates\/Summer%202016%20Construction%20-%20Buildings%20Map%20-%20040616.pdf\">construction projects<\/a>\u00a0also are available online.\u00a0<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p><a class=\"search-results-excerpt-link\" href=\"https:\/\/in.nau.edu\/news\/construction-summer\/\">Construction on Northern Arizona University&#8217;s Flagstaff campus this summer includes improvements to the pedway and road\u00a0repair on San Francisco Street. Pedway improvements will be made between DuPont Avenue and\u00a0the University Union. The first phase will begin Monday, May 16,\u00a0and encompass the area between the north side of the University Union\u00a0and the north side of the&hellip;<\/a><\/p>\n","protected":false},"author":46,"featured_media":43804,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[4],"tags":[],"class_list":["post-43791","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-campus-community"],"acf":[],"_links":{"self":[{"href":"https:\/\/in.nau.edu\/news\/wp-json\/wp\/v2\/posts\/43791","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/in.nau.edu\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/in.nau.edu\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/in.nau.edu\/news\/wp-json\/wp\/v2\/users\/46"}],"replies":[{"embeddable":true,"href":"https:\/\/in.nau.edu\/news\/wp-json\/wp\/v2\/comments?post=43791"}],"version-history":[{"count":0,"href":"https:\/\/in.nau.edu\/news\/wp-json\/wp\/v2\/posts\/43791\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/in.nau.edu\/news\/wp-json\/wp\/v2\/media\/43804"}],"wp:attachment":[{"href":"https:\/\/in.nau.edu\/news\/wp-json\/wp\/v2\/media?parent=43791"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/in.nau.edu\/news\/wp-json\/wp\/v2\/categories?post=43791"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/in.nau.edu\/news\/wp-json\/wp\/v2\/tags?post=43791"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}