{"id":24935,"date":"2007-01-18T09:02:10","date_gmt":"2007-01-18T16:02:10","guid":{"rendered":"http:\/\/stage.headlessnauedu-b6hgdzckfdgxgzhe.westus-01.azurewebsites.net\/?p=24935"},"modified":"2015-08-17T15:21:38","modified_gmt":"2015-08-17T22:21:38","slug":"new-nau-buildings","status":"publish","type":"post","link":"https:\/\/in.nau.edu\/news\/new-nau-buildings\/","title":{"rendered":"New NAU buildings"},"content":{"rendered":"<p><strong>Applied Research and Development Building<\/strong><\/p>\n<blockquote><p>Work is now focusing on the interior of what has been tagged NAU&#8217;s &#8220;signature building,&#8221; and the 60,000-square-foot, $25 million facility is on track for opening in late spring.<\/p>\n<p>NAU is seeking a platinum rating for sustainable design from the Leadership in Energy and Environmental Design Green Building rating system.<\/p><\/blockquote>\n<p><strong>Dining expansion<\/strong><\/p>\n<blockquote><p>A plan to expand the University Union&#8217;s dining space will add about 200 seats and increase the union&#8217;s frontline cooking space. Crews are slated to break ground in late spring on the property adjacent to Java.com and the Fieldhouse, connecting the building&#8217;s addition to both parts of the union.<\/p>\n<p>&#8220;The project is still in the design phase,&#8221; said\u00a0<strong>Mark Flynn<\/strong>, executive director of Capital Assets and Services, adding that once it&#8217;s approved the expansion could be completed as soon as summer 2008.<\/p><\/blockquote>\n<p><strong>New residence hall<\/strong><\/p>\n<blockquote><p>Construction will begin this semester on a new suite-style residence hall in the heart of campus in the space between the Gateway Student Success Center and Raymond Hall. Flynn said planners are &#8220;very active&#8221; in the design process, which will likely be a three-story building that could house between 350-400 students in similar suite style as Gillenwater and Raymond halls.<\/p><\/blockquote>\n<p><strong>Conference center<\/strong><\/p>\n<blockquote><p>Flynn said crews are working &#8220;feverishly&#8221; on the hotel-conference center complex, and recently completed delivery of electricity to the site. He said &#8220;dramatic changes&#8221; will begin to take place above the ground now that the foundation work is complete and work can begin on the complex&#8217;s structures.<\/p><\/blockquote>\n","protected":false},"excerpt":{"rendered":"<p><a class=\"search-results-excerpt-link\" href=\"https:\/\/in.nau.edu\/news\/new-nau-buildings\/\">Applied Research and Development Building Work is now focusing on the interior of what has been tagged NAU&#8217;s &#8220;signature building,&#8221; and the 60,000-square-foot, $25 million facility is on track for opening in late spring. NAU is seeking a platinum rating for sustainable design from the Leadership in Energy and Environmental Design Green Building rating system.&hellip;<\/a><\/p>\n","protected":false},"author":46,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[4],"tags":[],"class_list":["post-24935","post","type-post","status-publish","format-standard","hentry","category-campus-community"],"acf":[],"_links":{"self":[{"href":"https:\/\/in.nau.edu\/news\/wp-json\/wp\/v2\/posts\/24935","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/in.nau.edu\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/in.nau.edu\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/in.nau.edu\/news\/wp-json\/wp\/v2\/users\/46"}],"replies":[{"embeddable":true,"href":"https:\/\/in.nau.edu\/news\/wp-json\/wp\/v2\/comments?post=24935"}],"version-history":[{"count":0,"href":"https:\/\/in.nau.edu\/news\/wp-json\/wp\/v2\/posts\/24935\/revisions"}],"wp:attachment":[{"href":"https:\/\/in.nau.edu\/news\/wp-json\/wp\/v2\/media?parent=24935"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/in.nau.edu\/news\/wp-json\/wp\/v2\/categories?post=24935"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/in.nau.edu\/news\/wp-json\/wp\/v2\/tags?post=24935"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}