Facility Services
Virtual Visit Request info Apply
MENUMENU
  • Operations
    • Operations & Maintenance »
    • Business Operations »
      • BIAC Financials
      • BIAC Employee Services
    • Snow Information
  • Planning, Design & Construction
    • Planning, Design & Construction »
      • Planning
      • Design & Construction
      • Bids RFQ
      • For Design Professionals & Contractors
      • LEED Buildings
      • PDC Forms
      • CPA Form
    • Office of Sustainability
  • Utility Services
  • Resources
  • About
    • Our Mission
    • Care Committee
  • IN
  • Facility Services
  • Residence Life Warehouse

Request Forms

  • Submit a Work Request
  • Vehicle Rental Request
  • Project Initiation

Quick Links

  • For faculty, staff & building managers
  • For design professionals & contractors
  • Bids & RFQ's
  • Insurance & Claims Services
  • Office of the Fire Marshal
  • Current construction

Residence Life Warehouse

  • Architect: Johnson Walzer Associates
  • Contractor: Flagstaff Design & Construction

Achieving LEED Silver

Highlights

  • 100% reduction in potable water use for irrigation
  • 75% natural daylighting provided for occupied spaces
  • 66% use of raw recycled materials
  • 50% of construction debris diverted to recycling facilities rather than to the landfill

The Residence Life Warehouse utilizes unique water savings solutions. Native aspen trees were planted to provide shade and help visually screen the building from the public way. Grey water provided by the laundry facility was utilized to help establish the aspen trees.

Energy efficiency

  • Lighting control and task lighting allows for more responsible use of energy to satisfy electricity demands.
  • Low-energy consuming computing elements are utilized throughout the building.

Water efficiency

Grey water provided by the warehouse’s on-site laundry facility provides 53,000 gallons of water each year.

The roof of the warehouse is designed to collect rainwater and redirect it towards landscaped areas.

Construction

  • Up to 20% of the total materials were manufactured regionally.
  • The frame of the building was constructed with 100% recycled steel that was regionally manufactured.
  • Materials with low-emission of chemicals and pollutants were used for sealants, paints, carpet systems, or wood/laminate adhesives.
  • Concrete slabs, foundation, and exterior walls were reused, saving money and energy that goes into replacing these elements.

Reduced building impact

Only two parking spaces were added to serve the building, both parking spots are available only for low-emitting and fuel-efficient forms of travel

Facility Services
Location
Building 77
501 E Pine Knoll Dr
Flagstaff, Arizona 86011
Mailing Address
PO Box: 6016
Flagstaff, Arizona 86011
Contact Form
Email
Dennis.Zickefoose@nau.edu
Phone
928-523-4227
Social Media
Visit us on Twitter Facebook Instagram LinkedIn