Most viewed
- About NAU energy research
- Bicycle generator project
- 2015 Arizona wind & solar status report
- Education
- Energy experts
- Energy research
- Four Corners Wind Resource Center
- 2013 Arizona wind & solar status report
- Interactive Arizona wind map
Recent reports
- 2015 Arizona wind & solar status report
- 2013 Arizona wind & solar status report
- "The Future of Electricity: Embracing Transition"
- Prescott Airport solar facility & variability study
- Integration of Wind and Hydropower Systems: Issues, Impacts and Economics. Vol. 1
- Integration of Wind and Hydropower Systems: Case Studies. Vol. 2
Report overview
This report details utility-scale renewable energy projects, 1 megawatt (MW) or larger, on Arizona’s public, private, Native American, and military land. Details are presented on the size, technology, and status of projects. Where there are no utility scale developments, we outline the priorities for renewable energy development and highlight some smaller-scale installations. This information was gathered through direct contact with county employees, tribal members, and online searches. Major findings include:
- At the end of 2013, there were around 1,460 MW of utility scale renewable energy operating and under construction in Arizona: 1,137 MW of utility scale solar; 288 MW of utility scale wind; and 35 MW of biomass/biogas energy.
- Maricopa County leads the counties in solar development with 566 MW of projects completed or under construction.
- The Dry Lake wind farm in Navajo County is the largest wind farm in Arizona with 127 MW capacity.
- There have not been any utility scale renewable energy projects on tribal lands, yet there have been a number of smaller scale projects and feasibility studies and other pre-development work for the pursuit of utility scale installations.
- Each branch of the military has its own internal goals for increasing the percentage of renewable energy it uses. Yet, only a few projects have been realized.
How projects are classified
- Proposed: the project has been proposed to the public by developers through press releases or presentations to government institutions.
- Under development: the project is going through the permitting process and/or seeking additional funding or developers.
- Under construction: the project has broken ground and is in the process of being built.
- Operating projects have been completed and are currently generating and selling electricity.
Report contents
Native American communities Accordion Closed
- AK Chin Indian community
- Cocopah Tribe
- Colorado River Tribes
- Fort McDowell Yavapai Nation
- Fort Mojave Tribe
- Gila River Indian community
- Havasupai Tribe
- Hopi Tribe
- Hualapai Tribe
- Kaibab Paiute Tribe
- Navajo Nation
- Pascua Yaqui Tribe
- Salt River Pima-Maricopa Indian community
- San Carlos Apache Tribe
- Tohono O’odham Nation
- Tonto Apache Tribe
- White Mountain Apache Tribe
- Yavapai Apache Nation
NOTE: This product is for informational purposes and is not considered complete. It has not been prepared for, nor is it suitable for legal, engineering, or surveying purposes. Users of this information should review or consult the primary data and information sources to ascertain the usability of the information. There are no warranties, expressed or implied, including the warranty of merchantability or fitness for a particular purpose, accompanying this product. This report is current as of 12/31/13.